Birkenhead Tunnel Flyovers

Some may say an article and photo assignment about urban flyovers is a peculiar subject.  As a regular commuter to Birkenhead I have always viewed the town centre flyovers which feed traffic into the Queensway road tunnel taking people under the River Mersey to Liverpool as a particular ugly form of 1960’s concrete brutalism architecture.  They have cut up Birkenhead town centre and do not show the town’s best side even on a sunny day as I took the photos contained in this article.  Most commuters will probably be too pre-occupied with their journeys to take any real notice of the road network around them.  If you explore on foot you discover a number of forgotten streets deep below the speeding commuter traffic.  Whilst making a definitive physical statement and defining the town they have an important purpose in keeping Liverpool bound traffic moving as I have found out.

DSCF2418v2

DSCF2452v2

The Birkenhead to Liverpool tunnel was opened in the 1930s.  Over the years the cross-river road usage was increasing to such a level that it was causing chronic traffic jams at each end.  The original 1930s Birkenhead terminus only had a small number of toll booths and there was congestion with the surrounding roads, and by the 1960s this was causing traffic problems across the town.

DSCF2438v2

DSCF2398v2

Whilst a brand new tunnel was being built from Wallasey to the north of Wirral to relieve the Queensway tunnel, the planners drew up a scheme to demolish huge areas of Birkenhead and to build a series of large flyovers in the town centre to serve the tunnel.

DSCF2405v2

DSCF2440v2

The original tunnel had bottlenecks along its route with two junctions inside which had their own traffic signals.  There were also toll booths at each entrance.  As part of the upgrading the junctions inside the tunnel were remodelled. The Liverpool spur became exit-only, allowing traffic from Birkenhead to opt for the Dock exit or the Haymarket exit. The Birkenhead spur to the docks which came out onto Rendel Street was closed.  Apparently its traffic signals were unreliable and caused long delays.

DSCF2419v2

Brian Colquhoun and Partners, one of the engineering companies involved in the construction of the original tunnel were appointed to review the arrangements and develop a plan to solve the traffic chaos.  They reported back in August 1966 with their proposals.  All tolls would be collected at the Birkenhead end of the tunnel rather than at both ends.  Traffic entering and exiting the tunnel would be segregated and the local road network in Birkenhead town centre would be re-engineered to allow free movement from the major radial routes to the tunnel mouth stopping only for the toll.  To alleviate rush hour congestion towards Liverpool, marshalling areas would be created where traffic queues would be managed and controlled and congestion would not spill onto the surrounding streets.

DSCF2441v2

The plan involved clearing a large area of central Birkenhead including more than 170 homes, 90 shops, 23 factories and 14 pubs.  They were replaced with vast open areas of tarmac and two kilometres of new elevated and tunnelled roads. The construction works lasted over two years including the complete renovation of several railway tunnels underneath, with the computer controlled queuing system with the scheme opening to traffic in July 1969.

DSCF2414v2

Like many cities in the 1960’s embracing the ‘white heat of technology’, to quote former Prime Minister Harold Wilson, they were too enthusiastic in demolishing old buildings and replacing them with modern concrete constructions.  As I set out in my earlier article on Birkenhead Priory, St Mary’s church the town’s first parish church lost its congregation in the clearances of housing required for the construction of the tunnel. (https://briansimpsons.wordpress.com/2015/10/31/birkenhead-priory/)

DSCF2416v2

DSCF2445v2

The new road layout used huge lengths of elevated roadway to allow all traffic entering or exiting the tunnel to get to and from each of the three major approaches to the tunnel without causing congestion with other local traffic.

DSCF2400v2

DSCF2432v2

The main elevated flyover now dwarfs a piece of more historic Birkenhead: King Edward VII Memorial Clock Tower situated in the roundabout on Clifton Crescent opposite the now empty Central Hotel which lends an even more care worn feel to this area of town.

DSCF2422v2

DSCF2415v2

The clock tower is a Grade II listed building is a memorial to the reign of King Edward VII and was designed by Edmund Kirby and was erected by public subscriptions in 1911.  It was originally situated in Argyle Street, near Birkenhead Central Station but it was in the way when the area was redeveloped to improve road links to the Birkenhead Tunnel.  This meant that in about 1929 it was moved 50 metres to its present location in Clifton Crescent. The Central Hotel was built in 1938, and the flyover was added from 1966, so the Clock Tower has seen many changes to its surroundings since it was first built.  The clocks are maintained and in working order, so it has not been completely forgotten.

DSCF2424v2

DSCF2434v2

The network of flyovers continues to move traffic around the town and into the tunnel as it was designed to back in the 1960s.  However some of the high level flyovers didn’t survive entirely unscathed.  Whilst the Borough Road flyover has been the main subject of my photos this month; the flyover which used to rise above Conway Street has been demolished.

DSCF2453v2

In the early 1990s, Wirral Council set up the ‘City Lands’ regeneration scheme under the then government’s City Challenge Fund.  The plan saw major regeneration work across Birkenhead’s town centre and a key project was to remove what was seen as a major barrier which cut the main town centre into two and was far too close to the main shopping precinct.  It was demolished and replaced with two roundabouts, and with it went the long, thin elevated road running diagonally north-westwards across the tunnel’s plaza complex. There’s now just a little stub to show where the flyover used to start. There is now no direct way from the tunnel to the main shopping area, and traffic wanting to do this now has to go around the road system instead.

DSCF2450v2

At the Liverpool end the toll booths were removed and plans were developed for a Liverpool Inner Motorway system with the tunnel connecting to this as an integrated transport system.  But it was never fully realised and the Churchill Way flyover in Liverpool was the only tangible development which rises close to the tunnel exit in the city centre.

DSCF2411v2

DSCF2449v2

The flyovers were an expression of modern urban Britain in the 1960s and we still use them today.  Many of us take them for granted.  Walking around the town centre you get a different angle on them from speeding along them in our insulated vehicles.

DSCF2406v2

DSCF2455v2

Thanks to Chris Marshall’s article ‘Flyovers and flashing lights’ about the Queensway tunnel on his website http://www.cbrd.co.uk  which is dedicated to the study of the entire road network of mainland Britain.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s